top of page

MULTIPURPOSE BUILDING PROJECT

Will you help us?

The Multipurpose Building

includes:

1. Administrative Offices

2. Libraries

3. Computer Laboratories

4. Temporary Dormitories

5. Main Hall

6. Meeting Rooms

Progress on the Multipurpose Building

Follow our Progress 

September 2018

IMG-20180914-WA0002.jpg
IMG-20180914-WA0003.jpg

Getting ready for another phase of building on the Multi-Purpose Building.

 

Stone aggregates, sand, timber and cement have been delivered to Leo Primary School.

October 2018

IMG-20180916-WA0001.jpg
IMG-20180916-WA0003.jpg

November 2018

Top floor concrete slab pouring completed November 7, 2018.

IMG-20181107-WA0002.jpg
IMG-20181107-WA0003.jpg
IMG-20181107-WA0004.jpg

January 2020

The roof on the three story Multi Purpose Building is in the progress of being constructed at Leo Primary School.

IMG-20200118-WA0005.jpg
IMG-20200118-WA0001.jpg
IMG-20191111-WA0000.jpg
IMG-20200118-WA0002.jpg

(Right) Six tanks will be placed on slabs in the ceiling to harvest rain water and store it for use in the toilets of the building. 

February 2020

IMG-20200211-WA0003.jpg
IMG-20200212-WA0002.jpg
IMG-20200203-WA0003.jpg

As of February 2020, the Multipurpose Building, though not totally completed, is providing much needed classrooms on the bottom floor. In addition, the Examination room that will be used for the 7th year student evaluation and testing is ready for use, along with an unfinished Main Hall on the top floor, which was recently used for a parents meeting.

IMG-20200314-WA0000.jpg

Above: Pictures of the front of the Multipurpose Building. The roofing was finished in February.

Right: Picture of the back of the Multipurpose Building. 

Left: The first parents' meeting was held in our unfinished Main Hall in the Multipurpose Building at Leo Primary School.

IMG-20200211-WA0005.jpg

Summer 2020





 

November 2021

0b8d9d39-439a-4cc4-b79b-ecdaf6bb444f.JPG
b172a3d6-4acc-4a67-a9ec-e22a6bddd050.JPG
6ff3c126-9487-446e-8632-cba7c73bf63c.JPG
47fd3e3a-fc9a-46e7-baeb-299ac26c4cc0.JPG
8297cc86-a64b-4500-a079-7b4b96e430e3.JPG

The third floor of the Multipurpose Building is currently underway. Thank you for your support!

January 2022

IMG-20220128-WA0003.jpg
IMG-20220128-WA0002.jpg

In these pictures the Multipurpose building is fully plastered and is in the process of being painted.

February 2022

IMG-20220205-WA0000.jpg

June 2022

Construction of the Kitchen and Dining Building for Students at Leo Primary School in Isingiro, Uganda, a project sponsored jointly by the Legacy Grant of the Archdiocese of Chicago and

Leti Resource Center in Illinois, USA.

IMG-20220618-WA0000.jpg
IMG-20220621-WA0000.jpg

July 2022

IMG-20220729-WA0000_edited.jpg

The roofing is in progress on the Kitchen and Dining Building for Students at Leo Primary School in Isingiro, Uganda, a project sponsored jointly by the Legacy Grant of the Archdiocese of Chicago and

Leti Resource Center in Illinois, USA.

bottom of page